13.8 C
Harrow on the Hill
Monday, May 27, 2024
HomeNewsRoadworks starting in Harrow this week

Roadworks starting in Harrow this week

A number of roadworks are set to start in and around Harrow this week.

Commuters and residents should be prepared for potential delays due to traffic management measures. Here are the details:

George V Avenue, Pinner
• Dates: 23 April – 25 April
• Traffic Management: Traffic control (give & take)
• Responsibility: Openreach
• Delays are likely due to roadworks.

Honeypot Lane, Brent
• Dates: 22 April
• Traffic Management: Contra-flow
• Responsibility: Transport for London
• Roadworks for a single day with expected delays.

North Circular Road, Barnet
• Dates: 24 April – 26 April
• Traffic Management: Lane closure
• Responsibility: Abovenet Communications UK Ltd
• Expect lane closures and traffic delays.

Pinner Road, North Harrow
• Dates: 24 April
• Traffic Management: Traffic control (multi-way signals)
• Responsibility: Virgin Media
• Roadworks scheduled for one day, with potential delays.

Watford Road, Harrow
• Dates: 22 April – 26 April
• Traffic Management: Traffic control (give & take)
• Responsibility: UK Power Networks
• Roadworks are set to start with anticipated traffic disruption.

Engineers Way, Wembley
• Dates: 22 April – 26 April
• Traffic Management: Traffic control (multi-way signals)
• Responsibility: Global Utility Connections
• Roadworks are planned, likely causing delays.

Please allow extra time for your commute and consider alternative routes to avoid these roadworks. Keep an eye on local traffic reports for real-time updates.

×